Feasibility study
Bozen (BZ),
Technical and economic feasibility study for the project of a "NOI-Bigwood" wooden tower
Client: Noi Techpark, Unibz

Collaborator:
Ing. Luca Molteni
Year:2021
Typology:administration building
ClimateHouse:A
Type of construction:wood construction
Construction site

The Bigwood project arose from the need of NOI Techpark research company in cooperation with the Free University of Bolzano to increase their number of workplaces for researchers to 50 units. For this purpose, a temporary building made of wood was to be planned, which would be manufactured using innovative construction techniques.
The feasibility study prepared by the office of Manuel Benedikter presented three different design alternatives to the client in order to minimise construction costs without compromising the comfort and quality of the spaces.
BIM software was used to model the "Bigwood" project. This working method allowed complete control over the geometry and quantities. Furthermore, it shortened the period of planning by optimising the exchange of information with structure and facility planners.

Press & Media

Similar Projects

residential building
ClimateHouse: A nature

2020
Render
public building
ClimateHouse: -

2017
Rendering
public building
ClimateHouse: -

2018
Rendering
Do you have a project idea?
Then let's talk about it!